Difference between revisions of "Cologne 2019-04"
Jump to navigation
Jump to search
(→Tour) |
(→Tour) |
||
Line 12: | Line 12: | ||
[https://rp-online.de/nrw/staedte/duesseldorf/oberleitungsschaden-in-duesseldorf-behoben-alle-gleise-wieder-frei_aid-37907269 break of the catenary near Düsseldorf] which lead to major issues for Deutsche Bahn. | [https://rp-online.de/nrw/staedte/duesseldorf/oberleitungsschaden-in-duesseldorf-behoben-alle-gleise-wieder-frei_aid-37907269 break of the catenary near Düsseldorf] which lead to major issues for Deutsche Bahn. | ||
− | (Next article is written in german) | + | (Next article is written in german in the Rheinische Post newspaper from 2019-04-06) |
+ | |||
<pdf>paper_2019-06-26_200721.pdf</pdf> | <pdf>paper_2019-06-26_200721.pdf</pdf> | ||
Revision as of 19:13, 26 June 2019
Weather
https://www.windfinder.com/forecast/koeln_bonn
Tour
[ Cologne 2019-04→Como () ] →Como
What Links Here
Tour
We arrived from Meerbusch-Osterath by train at around 8 am. Our train EC 7 to Basel was scheduled for 8:53 am. But unfortunately there was a break of the catenary near Düsseldorf which lead to major issues for Deutsche Bahn.
(Next article is written in german in the Rheinische Post newspaper from 2019-04-06)
We ended up to start some 2 1/2 hours late with EC 9 direction Zurich. Since the suisse rail didn't want that late train in there system the train only wen to Basel Bad. There we took an S-Bahn to Basel SBB then a train to Lugano and from there the S-Bahn to Chiasso. There we took or bikes to our final destination of the day Como.
- Before we go by train through the Gotthard Tunnel / Switzerland the landscape was covered in snow.
- After the Gotthard Tunnel / Switzerland the landscape was green.
- Change the train in ....
- We reached Como.